This video provides a full break down into how the modules for first light were constructed. The video reveals that a mix of assembly and traditional construction methods were used. It clearly shows the heirarchy of elements, components and sub-assemblies.
designing for disassembly presents an adaptable architectural strategy to improve the functionality of new zealand primary school classrooms
Showing posts with label first light. Show all posts
Showing posts with label first light. Show all posts
Friday, 20 May 2011
First Light - On Site Time Lapse
This video is very helpful, providing understanding into how the building is assembled and disassembled.
Thursday, 19 May 2011
Solar Decathlon - Case Study Research Video 1
Brief outline of how the building has been split up into 6 modules, to fit in flat pack containers.
Subscribe to:
Posts (Atom)