![]() |
| source: http://www.flatbushstrategy.co.nz/pages/map_of_study_area.html |
designing for disassembly presents an adaptable architectural strategy to improve the functionality of new zealand primary school classrooms
Showing posts with label flat bush. Show all posts
Showing posts with label flat bush. Show all posts
Saturday, 4 June 2011
Flat Bush - What is the Plan for the Future
More information regarding a potential site for my project:
| source: http://www.flatbushstrategy.co.nz/documents/InfoSheet_Strategy_Overview.pdf |
Flat Bush Area - Schooling Strategy
- The Ministry of Education is seeking feedback on its proposal for new schools in the Flat Bush area of Manukau City.
- A new town is being built at Flat Bush and it's estimated that 40,000 people will live there within 15 years. That will make it New Zealand's largest new town.
- New schools are required to meet the education needs of the approximately 8,500 children who will live in Flat Bush by the time it is fully developed.
- Approximately half the children are expected to be primary school age and half will be intermediate and secondary school age.
- The Ministry's proposal is for five primary schools, including Baverstock Oaks School which opened in 2005; two junior high schools for Years 7 to 10 children; and one senior secondary school catering for Years 11 - 13.
- Two school sites are already owned by the Ministry of Education. These are Baverstock Oaks School in Baverstock Road and a site in Jeffs Road,which the Ministry proposes to develop for a contributing school and a junior high school.
- Baverstock Oaks School has opened as a full primary school, catering for children up to Year 8. In about 2008, Baverstock Oaks School will become a Years 1 to 6 school and its Year 7 and 8 children will go to one of the junior high schools.
- It's expected that the Jeffs Road schools will be needed between 2008 and 2011.
- The Ministry is currently going through a planning process to have land in Ormiston Road zoned for three schools - a contributing school, a junior high school and a senior secondary school. The senior secondary school would be built first, sometime between 2011 and 2016.
- Sites are being being investigated for two more contributing schools - one in south-west Flat Bush where a new primary school will be needed by 2011 and the other in south-east Flat Bush where a new primary school will be needed sometime after 2015.
- It is intended that there will be early childhood education centres on all school sites.
- The consultation now underway is seeking the community's views on the proposed strategy, which will guide the future planning for Flat Bush schools.
source: http://www.flatbushstrategy.co.nz/pages/faq.html
Subscribe to:
Posts (Atom)
